27-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to GEPCO under Section 27B of the NEPRA Act on account of Continued violation with regard to earthing/ grounding of HT/LT Structures | View |
|
27-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to GEPCO under Regulation 4(8) & 4(9) of NEPRA (Fine) Regulations, 2021 on account of Decline in Performance with respect to Transmission and Distribution (T&D) losses and Recovery | View |
|
27-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to FESCO under Regulation 4(8) & 4(9) of NEPRA (Fine) Regulations, 2021 on account of Decline in Performance with respect to Transmission and Distribution (T&D) losses and Recovery | View |
|
27-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to QESCO under Regulation 4(8) & 4(9) of NEPRA (Fine) Regulations, 2021 on account of Decline in Performance with respect to Transmission and Distribution (T&D) losses and Recovery | View |
|
25-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to CEO-HESCO dated 13.02.2025 on account of non-compliance with the directions of the Authority hearing regarding Quarterly Adjustment of XW-DISCOs for the 3rd Quarter of FY 2023-24 of Safety Directorate/ Department under Regulation 4(8) & 4(9) of NEPRA (Fine) Regulations, 2021 | View |
|
25-10-2025 |
Notice of Hearing - Hearing regarding Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges, Impact of Incremental Units and Impact of T&D Losses on FCA for the 1st uarter of FY 2025-26 | View |
| Application for Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges, Impact of Incremental Units and Impact of T&D Losses on FCA for the 1st uarter of FY 2025-26 | View | |
|
25-10-2025 |
Notice of Hearing - Hearing regarding Petition filed by HAZECO for Determination of Supply Tariff for FY 2025-26 | View |
| Petition filed by HAZECO for Determination of Supply Tariff for FY 2025-26 | View | |
| Issues in the matter of Petitions filed by HAZECO for Determination of Its Distribution and Supply Tariff for the FY 2025-26 | View | |
|
25-10-2025 |
Notice of Hearing - Hearing regarding Petition filed by HAZECO for Determination of Distribution Tariff for FY 2025-26 | View |
| Petition filed by HAZECO for Determination of Supply Tariff for FY 2025-26 | View | |
| Issues in the matter of Petitions filed by HAZECO for Determination of Its Distribution and Supply Tariff for the FY 2025-26 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that MEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| MEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by MEPCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that MEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| MEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by MEPCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that SEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| SEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by SEPCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that SEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| SEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by SEPCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that HESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| HESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by HESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that HESCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| HESCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by HESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that GEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| GEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by GEPCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that GEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| GEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by GEPCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that QESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| QESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by QESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
25-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that QESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the Authority | View |
| QESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
| Issues for Hearing - Multi Year Tariff Petition filed by QESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
|
24-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that TESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30. | View |
| Issues for Hearing - Multi Year Tariff Petition filed by TESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
| TESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
|
24-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that TESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View |
| Issues for Hearing - Multi Year Tariff Petition filed by TESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
| TESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
|
24-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the General Public are notified that PESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30. | View |
| Issues for Hearing - Multi Year Tariff Petition filed by PESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
| PESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30. | View | |
|
24-10-2025 |
Notice of Admission/ Hearing - All stakeholders, interested/ affected persons and the general public are notified that PESCO has filed petition with NEPRA for the determination of its tariff for supply of electric power for the FY 2025-26 to FY 2029-30. | View |
| Issues for Hearing - Multi Year Tariff Petition filed by PESCO for Determination of Tariff for its Distribution and Supply of Power for the FY 2025-26 to FY 2029-30 | View | |
| PESCO has filed petition with NEPRA for the determination of its tariff for supply of electric power for the FY 2025-26 to FY 2029-30. | View | |
|
23-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to LESCO under Regulation 4(8) & 4(9) of NEPRA (Fine) Regulations, 2021 on account of Decline in Performance with respect to Transmission and Distribution (T&D) losses and Recovery based on Circular Debt (CD) for the month of June 2024 | View |
|
23-10-2025 |
Order of the Authority in the Matter of Show Cause Notice issued to IESCO under Regulation 4(8) & 4(9) of NEPRA (Fine) Regulations, 2021 on account of Decline in Performance with respect to Transmission and Distribution (T&D) losses and Recovery | View |
|
22-10-2025 |
Hearing regarding Fuel Charges Adjustment for the month of September 2025 for Ex-WAPDA Distribution Companies | View |
| CPPAG XWDISCOs' Energy Purchase Data for month of September 2025 | View | |
|
20-10-2025 |
Decision of the Authority in the matter of Motions for Leave for Review filed by the K-Electric Limited and Ministry of Energy against Determination of the Authority dated October 22, 2024 in the matter of tariff Petition of K-Electric for its Power Generation Plants | View |
|
20-10-2025 |
Decision of the Authority in the matter of Motion for Leave for Review filed by K-Electric and Mr. Muhammad Arif Bilwani against NEPRA Determination dated April 24, 2024 regarding Seven Years Transmission and Distribution Investment Plan and Losses Assessment for MYT tariff Control Period from FY 2023-24 to FY 2029-30 | View |
|
20-10-2025 |
Decision of the Authority in the matter of Motions for Leave for Review filed by K-Electric, The Ministry of Energy, CPPA-G, Mr. Arif Bilwani, Syed Hafeezuddin, MNA and M/S Jamat-e-IsIami through Mr. Monem Zafar Khan against MYT Determination of K-Electric for its Distribution function Dated 23.05.2025 | View |
|
20-10-2025 |
Decision of the Authority in the matter of Motions for Leave for Review filed by K-Electric, The Ministry of Energy, CPPA-G, Mr. Arif Bilwani, Syed Hafeezuddin MNA and M/S KCCI through Mr. Tanveer Ahmed Barry against MYT Determination of K-Electric for its Supply Function Dated 27.05.2025 | View |
|
20-10-2025 |
Decision of the Authority in the matter of Motions for Leave for Reviews filed by K-Electric and other Stakeholders against Decision of the Authority Dated May 23, 2025 in the matter of Transmission Tariff of K.E. under Multiyear tariff Regime for FY 2023-24 to FY 2029-30 | View |
|
20-10-2025 |
Decision of the Authority in the matter of Motions for Leave for Review filed by the Stakeholders against Decision of the Authority dated 5th June 2025 regarding Write-Off Claims of K-Electric Limited for MYT 2017-2023 | View |
|
15-10-2025 |
Determination of the Authority in the matter of CTBCM Final Test Run (FTR) and Approval of the Market Commercial Code | View |
|
15-10-2025 |
Notice - Licensee proposed Modification (LPM) in the Generation Licence of Jamshoro Power Company Limited (JPCL) | View |
| Application for Licensee proposed Modification (LPM) in the Generation Licence of Jamshoro Power Company Limited (JPCL) | View | |
|
14-10-2025 |
Determination Of The Authority in the matter of Application of Central Power Purchasing Agency (GUARANTEE) Limited for registration as Special Purpose Agent and approval of the Agency Code | View |
|
14-10-2025 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of August 2025 for EX-WAPDA DISCOs along with Notification Thereof | View |
|
09-10-2025 |
Order of the Authority in the matter of Explanation issued to M/S Tapal Energy Limited under Regulation 4(1) & 4(2) of the NEPRA (Fine) Regulations, 2021 | View |
|
08-10-2025 |
Order of the Authority in the matter of Show Cause Notice Issued to K-Electric Limited under Regulation4(8) & 4(9) of the NEPRA (Fine) Regulations, 2021 | View |
|
08-10-2025 |
Order of the Authority in the matter of Review Petition filed by LESCO against order of the Authority issued to LESCO, on account of failure to execute Earthing/Grounding of High Tension /Low Tension Poles/Structures in its service territory | View |
|
07-10-2025 |
Explanatory Note: It is hereby informed that the limitation period for filing any application, petition, appeal, motion for leave to review, or other proceedings under the NEPRA Act, Rules, Regulations, guidelines, or any subordinate legislation shall be calculated based on calendar days, unless expressly provided otherwise | |
|
19-09-2025 |
Notice for Comments in the matter of Application of FFBL Power Company Limited for grant of Electric Power Distribution Licence | View |
| Application of FFBL Power Company Limited for grant of Electric Power Distribution Licence | View | |
|
19-09-2025 |
Notice for Comments in the matter of Application of FFBL Power Company Limited for grant of Electric Power Supply Licence | View |
| Application of FFBL Power Company Limited for grant of Electric Power Supply Licence | View | |
|
18-09-2025 |
Hearing regarding Fuel Charges Adjustment for the month of August 2025 for Ex-WAPDA Distribution Companies | View |
| CPPAG - XWDISCOs Energy Purchase Data for the month of August 2025 | View | |
|
16-09-2025 |
Decision in the Matter of Motions for Leave for Review filed under Regulation 3(2) of the NEPRA (Review Procedure) Regulations, 2009 against the Decision of NEPRA dated December 23, 2024 regarding Application of Tariff Category for Cold Storages | View |
|
15-09-2025 |
ORDER OF THE AUTHORITY IN THE MATTER OF SHOW CAUSE NOTICE ISSUED TO HESCO UNDER REGULATIONS 4(15) NEPRA FINE REGULATIONS 2021. READ WITH SECTION 27B OF THE NEPRA ACT. ON ACCOUNT OF CONTINUED VIOLATION REGARDING AT&C-BASED LOAD SHEDDING | View |
|
12-09-2025 |
ORDER OF THE AUTHORITY IN THE MATTER OF SHOW CAUSE NOTICE ISSUED TO GUJRANWALA ELECTRIC POWER COMPANY LIMITED (GEPCO) UNDER REGULATION 4(8) & 4(9) OF NEPRA (FINE) REGULATIONS, 2021. FOR CHARGING OF DETECTION BILLS ON ACCOUNT OF SLOWNESS OF ENERGY METERS FOR MORE THAN TWO (2) BILLING CYCLES | View |
|
12-09-2025 |
ORDER OF THE AUTHORITY IN THE MATTER OF SHOW CAUSE NOTICE ISSUED TO SEPCO UNDER REGULATIONS 4(15) NEPRA FINE REGULATIONS 2021, READ WITH SECTION 27B OF THE NEPRA ACT. ON ACCOUNT OF CONTINUED VIOLATION REGARDING AT&C-BASED LOAD SHEDDING | View |
|
11-09-2025 |
Notice of Hearing - Hearing in the Matter of Tariff Petition filed by National Grid Company of Pakistan Limited for Determination of Use of System Charges (UoSC) for the FY 2022-23 to FY 2024-25 | View |
| Issues framed by the Authority for the hearing of Petition filed by National Grid Company of Pakistan Limited for Determination of Use of System Charges (UoSC) for the FY 2022-23 to FY 2024-25 | View | |
10-09-2025 |
Notice of Hearing - Hearing regarding Petitions filed by XWDISCOs for Determination of Use of System Charges to the Extent of Grid Charges | View |
| Petitions filed by XWDISCOs for Determination of Use of System Charges to the Extent of Grid Charges FESCO GEPCO HAZECO HESCO IESCO LESCO MEPCO PESCO QESCO SEPCO TESCO | ||
|
09-09-2025 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of July 2025 for EX-WAPDA DISCOs along with Notification Thereof | View |
|
05-09-2025 |
Notice of Hearing - Tariff modification Petitions filed by Sindh Nooriabad Power Company (Pvt.) Limited (SNPC-I) & Sindh Nooriabad Power Company Phase-II (Pvt.) Limited (SNPC-II) | View |
|
04-09-2025 |
Notice for Seeking Comments - in the matter of Application of Olympia Power Generation (Private) Limited for Grant of Licence of Electric Power Supply | View |
| Application of Olympia Power Generation (Private) Limited for Grant of Licence of Electric Power Supply | View | |
|
03-09-2025 |
Notice of Admission/ Hearing - Tariff Modification Petition filed by WAPDA Regulated Business (Hydroelectric) for FY 2025-26 | View |
| Tariff Modification Petition filed by WAPDA Regulated Business (Hydroelectric) for FY 2025-26 | View | |
| Issues for Hearing of Tariff Modification Petition filed by WAPDA Regulated Business (Hydroelectric) for FY 2025-26 | View | |
|
29-08-2025 |
Notice regarding Public Hearing - Five Years Distribution Investment Plan (DIP) submitted by Peshawar Electric Supply Company (PESCO) for FY 2025-26 to FY 2029-30 | View |
| Five Years Distribution Investment Plan (DIP) submitted by Peshawar Electric Supply Company (PESCO) for FY 2025-26 to FY 2029-30 | View | |
| Issues of Hearing - Five Years Distribution Investment Plan (DIP) submitted by Peshawar Electric Supply Company (PESCO) for FY 2025-26 to FY 2029-30 | View | |
|
28-08-2025 |
Notice regarding Public Hearing in the Matter of Distribution Investment Plan (DIP) submitted by Hazara Electric Supply Company (HAZCO) Limited for FY 2025-26 | View |
| Distribution Investment Plan (DIP) Submitted by Hazara Electric Supply Company (HAZECO) Limited for FY 2025-26 | View | |
| List of Issues for Public Hearing in the matter of Distribution Investment Plan (DIP) Submitted by Hazara Electric Supply Company (HAZECO) Limited for FY 2025-26 | View | |
|
22-08-2025 |
Hearing regarding Fuel Charges Adjustment for the month of July 2025 for EX-WAPDA Distribution Companies | View |
| CPPAG XWDISCOs Energy Purchase Data for month of July 2025 | View | |
| Uniform Application of Fuel Charges Adjustment Across the Country | View | |
|
20-08-2025 |
Notification S.R.O No. 1584(I)/2025 NEPRA hereby notifies the Decision of the Authority dated July 07,2025 in the matter of approval of Annual Fee payable to Private Power Infrastructure Board (PPIB) at each Anniversary of Commercial Operation Date (COD) as a Pass-Through | View |
|
09-08-2025 |
Notice of Admission - Tariff Petition filed by National Grid Company of Pakistan for Determination of Use of System Charges (UOSC) for the FY 2022-23 to 2024-25 | View |
| Tariff Petition filed by National Grid Company of Pakistan for Determination of Use of System Charges (UOSC) for the FY 2022-23 to 2024-25 | View | |
|
08-08-2025 |
Order of the Authority in the matter of Show Cause Notice Issued to the HESCO under Regulation 4(8) and 4(9) of NEPRA (Fine) Regulations, 2021. on account of Decline in performance with respect to Transmission and Distribution (T&D) Losses and recovery | View |
|
08-08-2025 |
Order of the Authority in the matter of Explanation issued to SEPCO under Re2ulation 4(1) and 4(2) of NEPRA (Fine) Regulations, 2021, on account of failure to execute Earthing/Grounding of HT/LT Poles/Structures in its service territory | View |
|
08-08-2025 |
Order of the Authority in the matter of Show Cause Notice issued to SEPCO on account of the Establishment of Safety Directorate/Department under Regulation 4(81 & 4(91 of NEPRA (Fine) Regulations, 2021 | View |
|
08-08-2025 |
Order of the Authority in the matter of Show Cause Notice issued to SEPCO under Regulations 4(8) and 4(91 of NEPRA (Fine) Regulations, 2021. on account of decline in performance with respect to Transmission and Distribution (T&D) Losses and recovery | View |
|
08-08-2025 |
Order of the Authority in the matter of Explanation issued to National Grid Company (NGC) under Regulations 4(T) & 4(2) of the NEPRA (Fine! Regulations. 2021. regarding Non-Submission of Report for Violating NGC Specification P-44:2018 | View |
|
07-08-2025 |
Notification S.R.O No. 1468(I)/2025 NEPRA hereby notifies complete Decision of the Authority along-with attached Annexure-A in the matter of Requests filed by XWDISCOs for Periodic Adjustment in Tariff for the 4th Quarter of FY 2024-25 | View |
|
07-08-2025 |
Decision of the Authority in the matter of requests filed by XWDISCOs for Periodic Adjustment in tariff for the 4th Quarter of FY 2024-25 | View |
|
07-08-2025 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of June 2025 for EX-WAPDA DISCOs along with Notification Thereof | View |
|
02-08-2025 |
Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Mughal Energy Limited | View |
| Application for Licensee Proposed Modification (LPM) in the Generation Licence of Mughal Energy Limited | View | |
|
29-07-2025 |
Notice of Hearing - Hearing regarding Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges, Impact of Incremental Units and Impact of T&D Losses on FCA for the 4th Quarter of FY 2024-25 | View |
| Request for Quarterly Adjustment of XWDISCOs on account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges, Impact of Incremental Units and Impact of T&D Losses on FCA for the 4th Quarter of FY 2024-25 | View | |
29-07-2025 |
Notice of Hearing - Hearing regarding Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges, Impact of Incremental Units and Impact of T&D Losses on FCA for the 4th Quarter of FY 2024-25 | View |
29-07-2025 |
Public Notice regarding Seeking Comments in the matter of Service Level Agreement (the "SLA") of Bin Qasim Power Station-II (the "BQPS-II") by K-Electric Limited (the "KEL) | View |
| Service Level Agreement of BQPS-II K-Electric | View | |
| Technical Curves of BQPS-II K-Electric | ||
| Schedules of BQPS-II K-Electric | View | |
|
29-07-2025 |
Public Notice regarding Seeking Comments in the matter of Service Level Agreement (the "SLA") of Bin Qasim Power Station (the "BQPS-I") by K-Electric Limited (the "KEL) | View |
| Service Level Agreement of BQPS-I K-Electric | View | |
| Technical Curves of BQPS-I K-Electric | ||
| Schedules of BQPS-I K-Electric | View | |
|
24-07-2025 |
Public Notice regarding Seeking Comments in the matter of Service Level Agreement (the "SLA") of Korangi Combined Cycle Power Plant (the "KCCP") by K-Electric Limited (the "KEL) | View |
| Service Level Agreement of KCCP K-Electric | View | |
| Technical Curves of Korangi Combined Cycle KCCP K-Electric Limited | ||
| Schedules of Korangi Combined Cycle Power Plant | View | |
19-07-2025 |
Hearing regarding Fuel Charges Adjustment for the month of June 2025 for Ex-WAPDA Distribution Companies | View |
| CPPAG XWDISCOs' Energy Purchase Data for month of June 2025 | View | |
18-07-2025 |
Notification S.R.O No. 1287 (I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 27, 2025 in the matter of Petition filed by K-Electric Limited for Determination of Supply tariff under Multi Year tariff Regime for the Period from FY 2023-24 to FY 2029-30 | |
18-07-2025 |
Notification S.R.O No. 1286 (I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 23, 2025 in the matter of Petition filed by K-Electric Limited for Determination of Distribution tariff under Multi Year tariff Regime for the Period from FY 2023-24 to FY 2029-30 | |
18-07-2025 |
Notification S.R.O No. 1285 (I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 23, 2025 in the matter of Petition filed by K-Electric Limited for Determination of Transmission tariff under Multi Year tariff Regime for the Period from FY 2023-24 to FY 2029-30 | |
| 17-07-2025 | Notice - Licencee Proposed Modification in the Generation Licence of FFBL Power Company Limited | View |
| Application for Licencee Proposed Modification in the Generation Licence of FFBL Power Company Limited | View | |
| 16-07-2025 | Grant of Generation Licence No. SGC/179/2025 Licence Application No. LAG-523 Kundian Hvdel Power (Private) Limited (KHPPL) | View |
|
09-07-2025 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of May 2025 for EX-WAPDA DISCOs along with Notification Thereof | View |
09-07-2025 |
Decision of the Authority in the matter of Provisional Monthly Fuel Charges Adjustments requested by K-Electric Limited for April 2025 | View |
|
08-07-2025 |
ORDER OF THE AUTHORITY IN THE MATTER OF REVIEW PETITION FILED BY FESCO AGAINST THE ORDER OF THE AUTHORITY DATED JULY 05, 2024 IN THE MATTER OF SHOW CAUSE NOTICE ISSUED DATED AUGUST 30, 2023, TO FESCO ON ACCOUNT OF FATAL ACCIDENTS THAT OCCURRED DURING FY 2022-23 | View |
08-07-2025 |
Notice - Licencee Proposed Modification in the Generation Licence of Ittefaq Power Limited | |
| Application for Licencee Proposed Modification in the Generation Licence of Ittefaq Power Limited | ||
07-07-2025 |
Decision of the Authority in the matter of Approval of Annual Fee Payable to PPIB at each Anniversary of Commercial Operation Date (COD) as a Pass-Through | |
04-07-2025 |
Public Notice regarding Seeking Comments in the matter of Service Level Agreement (the "SLA" of Bin Qasim Power Station-III (the "BQPS-III" by K-Electric Limited (the "KEL") | |
| Service Level Agreement of BQPS -III of K-Electric | ||
| Technical Curves of Bin Qasim Power Station-3 (BQPS-III) K-Electric | ||
| Schedules of Bin Qasim Power Station-3 (BQPS-III) K-Electric | ||
04-07-2025 |
Notice in the Matter of Application of Aerem Energy (Private) Limited for grant of Concurrence | |
| Application of Aerem Energy (Private) Limited for grant of Concurrence | ||
| 02-07-2025 | Determination of the Authority in the Matter of Review Petition of Lahore Electric Supply Company Limited Pertaining to Electric Power Supply Licence | View |
| 02-07-2025 | Determination of the Authority in the Matter of Review Petition of Multan Electric Power Company Limited Pertaining to Electric Power Supply Licence | View |
| 02-07-2025 | Determination of the Authority in the Matter of Review Petition of Gujranwala Electric Power Company Limited Pertaining to Electric Power Supply Licence | View |
| 02-07-2025 | Determination of the Authority in the Matter of Review Petition of Gujranwala Electric Power Company Limited Pertaining to Distribution Licence | View |
01-07-2025 |
Decision of the Authority in the matter of Motion filed by the Federal Government under Section 7 and 31(7) of the NEPRA Act 1997 read with Rule 17 of NEPRA (Tariff Standards and Procedure) Rules, 1998 with respect to Recommendation of Consumer-end-Tariff. | |
29-06-2025 |
Public Hearing regarding Federal Government Motion with respect to Recommendation of Consumer End Tariff for XWDISCO and K-Electric, under Section 7 and 31 of NEPRA Act read with Rule 17 of the NEPRA Tariff (Standards and Procedures) Rules, 1998 (The Rules) | |
| Federal Government Motion with respect to Recommendation of Consumer End Tariff for XWDISCO and K-Electric, under Section 7 and 31 of NEPRA Act read with Rule 17 of the NEPRA Tariff (Standards and Procedures) Rules, 1998 (The Rules) Cabinet Approval | ||
|
25-06-2025 |
Hearing regarding Fuel Charges Adjustment for the month of May 2025 for EX-WAPDA Distribution Companies | View |
| Revised XWDISCOs Energy Purchase Data for month of May 2025 | View | |
|
25-06-2025 |
Re-Scheduling of Hearing - Request of K-Electric Limited (KE) for Provisional monthly Fuel Charges Adjustment (FCA) for April 2025 | View |
|
23-06-2025 |
Show Cause Notice to K-Electric under Regulation (8) and (9) of the NEPRA (Fines) Regulations, 2021 on account of Non-Compliance of Authority Directives | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Hyderabad Electric Supply Company (HESCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply ofPower functions | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Sukkur Electric Power Company (SEPCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply of Power functions | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Quetta Electric Supply Company (QESCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply of Power functions | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Peshawar Electric Supply Company (PESCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and SuppIv of Power functions | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Multan Electric Power Company (MEPCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply of Power functions | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Gujranwala Electric Power Company (GEPCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply of Power functions | View |
|
23-06-2025 |
Decision regarding Motion for Leave for Review (MLR) filed by Islamabad Electric Supply Company (IESCO) against its MYT determination for the period FY 2023-24 to FY 2027-28 | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Islamabad Electric Supply Company (IESCO) for Adjustment/Indexation of tariff for FY 2025-26 under MYT | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Faisalabad Electric Supply Power Company (FESCO) for Adjustment/Indexation of tariff for FY 2025-26 under MYT | View |
|
23-06-2025 |
Decision regarding Motion for Leave for Review (MLR) filed bv Lahore Electric Supply Company (LESCO) against its MYT determination for the period FY 2023-24 to FY 2027-28 | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Lahore Electric Supply Company (LESCO) for Adjustment/Indexation of tariff for FY 2025*26 under MYT | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Tribal Areas Electricity Supply Company (TESCO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply ofPower functions | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by CPPA-G for Power Purchase Price Forecast for the FY 2025-26 | View |
|
23-06-2025 |
Decision of the Authority in the matter of request filed by Hazara Electric Supply Company (HAZECO) for Determination of Interim tariff for the FY 2025-26 for its Distribution and Supply of Power functions | View |
|
23-06-2025 |
DECISION OF THE AUTHORITY UNDER NEPRA (REVIEW PROCEDURE) REGULATIONS, 2009 REGARDING DECISION DATED 27-05-2025 IN THE MATTER OF JOINT APPLICATION FILED BY CENTRAL POWER PURCHASING AGENCY (GUARANTEED LIMITED AND FOUNDATION POWER COMPANY DAHARKI LIMITED FOR REDUCTION IN TARIFF COMPONENTS | View |
|
23-06-2025 |
DECISION OF THE AUTHORITY UNDER NEPRA (REVIEW PROCEDURE) REGULATIONS, 2009 REGARDING DECISION DATED 27-05-2025 IN THE MATTER OF JOINT APPLICATION FILED BY CENTRAL POWER PURCHASING AGENCY (GUARANTEE) LIMITED AND ATTOCK GEN LIMITED FOR REDUCTION IN TARIFF COMPONENTS | View |
|
23-06-2025 |
Grant of Generation Licence No. GL/29/2025 Licence Application No. LAG-525 Central Power Generation Company Limited (CPGCL) | View |
|
23-06-2025 |
Modification in Generation Licence No. GL/02/2002 Licence Application No. LAG-01 Central Power Generation Company Limited | View |
|
20-06-2025 |
Notice Licensee Proposed Modification (LPM) in the Distribution Licence of Sukkur Electric Power Company Limited (SEPCO) | View |
| Application for Licensee Proposed Modification (LPM) in the Distribution Licence of Sukkur Electric Power Company Limited (SEPCO) | View | |
|
20-06-2025 |
Notice in the matter of Application of NRTC Energies (Private) Limited for grant of Concurrence | View |
| Application of NRTC Energies (Private) Limited for grant of Concurrence | View | |
| 01-07-2021 | Form for submission of Motion for Leave for Review under Regulation 3(2) NEPRA (Review Procedure) Regulations, 2009 | View |
Media Gallery
| 26-11-2024 | Press Release for Postponement of Public Hearing in the matter of Approval of Bid Evaluation Report (BER) submitted by K-Electric Limited (KEL) for 50 MW Winder and 100 MW Bela Projects at Balochistan | View |
| 20-06-2023 | Press Release - Webinar on “Implementation Roadmap - NEPRA IT/OT Cyber security Regulations (Distribution Network) | View |
| 12-06-2023 | Press Release - Webinar on Implementation Roadmap – NEPRA’s Information Technology (IT) /Operational Technology (OT) Cybersecurity Regulations | View |
| 09-06-2023 | Press Release - Facilitation of Power Development initiatives in AJK | View |
| 07-06-2023 | Press Release - Webinar on Block chain in Energy Trade | View |
| 26-05-2023 | Press Release - Awareness Session on Legal & Safety Requirements for Bulk Power Consumers for Power Sector | View |
| 16-05-2023 | Press Release - Workshop on Implementation Roadmap - NEPRA IT/OT Cyber Security Regulations | View |
| 31-03-2023 | Press Release - Chairman NEPRA reviews progress of the SCADA Phase-III Upgradation Project by NTDC | View |
| 22-03-2023 | Press Release - NEPRA grants System Operator Licence to NTDC and approves Grid Code | View |
| 09-03-2023 | Press Release - NEPRA celebrates International Women’s Day- 2023 | View |
| 27-02-2023 | Press Release - NEPRA briefs the visiting students of NUST | View |
| 22-02-2023 | Press Release - NEPRA holds Awareness Session on “Incident Investigation” for Power Sector | View |
| 16-02-2023 | Press Release - Inquiry into the matter of Total Power System Collapse occurred on January 23, 2023 | View |
| 03-02-2023 | Press Release - NEPRA approves IGCEP 2022-31 | View |
-
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that TESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30.Advertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that TESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30.Advertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that PESCO has filed petition with NEPRA for the determination of its tariff for distribution of electric power for the FY 2025-26 to FY 2029-30.Advertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the general public are notified that PESCO has filed petition with NEPRA for the determination of its tariff for supply of electric power for the FY 2025-26 to FY 2029-30.Advertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that MEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that MEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that GEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that GEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that SEPCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that SEPCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that HESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that HESCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that QESCO has filed petition with NEPRA for the determination of its tariff for Supply of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Admission/ Hearing
All stakeholders, interested/ affected persons and the General Public are notified that QESCO has filed petition with NEPRA for the determination of its tariff for Distribution of electric power for the FY 2025-26 to FY 2029-30. The same has been admitted by the AuthorityAdvertisement -
Notice of Hearing
Hearing regarding Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges, Impact of Incremental Units and Impact of T&D Losses on FCA for the 1st uarter of FY 2025-26Advertisement -
Notice of Hearing
Hearing regarding Petition filed by HAZECO for Determination of Supply Tariff for FY 2025-26Advertisement -
Notice of Hearing
Hearing regarding Petition filed by HAZECO for Determination of Distribution Tariff for FY 2025-26Advertisement