Application of Shahtaj Sugar Mills Limited for Review of Generation Tariff dated January 02, 2017 Notified Vide SRO No. 453(I)/2017 dated June 07, 2017 before NEPRA in respect of SSML 32 MW Bagasse Based Co-Generation Power Project. | |
Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 36.6 MW Daral Khwar Hydropower Project located at Swat, Khyber Pakhtunkhwa Province | View |
CPPA-G Petition for the Determination of Market Operation Fee for the Financial Year 2020-21 | view |
Addendum CPPA-G Petition for the Determination of Market Operation Fee for the Financial Year 2020-21 | view |
Federal Government Motion with respect to
Recommendation of Consumer End Tariff for
XWDISCOs, under Section 31(4) and 31(7) of
the Regulation of Generation, Transmission and
Distribution of Electric Power Act 1997 (The
Act) read with Rule 17 of the NEPRA Tariff
(Standards and Procedures) Rules, 1998
|
|
Petitions for Revision of Tariff Determinations of Quaid-e- Azam Thermal Power (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | |
Petitions for Revision of Tariff Determinations of Punjab Thermal Power (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | |
Petitions for Revision of Tariff Determinations of Quaid-e-Azam Solar (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | View |
Application for Modification Petition
filed by Central Power Purchasing Agency (Guarantee) Limited for
approval of Negotiated/ Signed Power Purchase Agreement regarding
procurement of Power from 102 MW Gulpur Hydropower Project of
Mira Power Limited |
|
Case Officer's report in the matter of
Modification of the Tariff Determination - Sindh Transmission &
Dispatch Company Company (Pvt.) Limited (STDC) |
Revised Tariff Petition for Approval/ Determination of Revised Tariff for Jamshoro Power Compay Limited (JPCL) | view |
Petition for Modification of Reference Tariff of Combined Cycle Power Plant Nandipur Gujranwala (Northern Power Generation Company Limited - GENCO-III | view |
Motion for Leave for Review filed by Tricom Wind Power (Private) Limited against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by NASDA Green Energy (Pvt.) Ltd. against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Metro Wind Power Limited against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Master Green Energy Limited against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Liberty Wind Power-2 against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Liberty Wind Power-1 against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Lakeside Energy (Pvt.) Ltd. against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Indus Wind Energy Ltd. against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Gul Ahmed Electric Limited against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Din Energy Ltd. against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Artistic Wind Power (Pvt.) Ltd. against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review filed by Act2 Wind Private Limited against Decision of the Authority in the matter of Tariff Modification dated July 23, 2020 | view |
Motion for Leave for Review by Sino Well (Private) Limited against the Determination of the Authority in the matter of Tariff Petition issued dated August 07, 2020 | view |
Motion for Leave for Review filed by Shafi Energy (Private) Limited against the Determination of the Authority in the matter of Tariff Petition issued dated August 07, 2020 | view |
Motion for Leave for Review by Norinco International Thatha Power (Private) Limited against the Determination of the Authority in the matter of Tariff Petition issued dated August 18, 2020 | view |
Motion for Leave for Review by Moro Power Company (Pvt.) Ltd. against the Determination of the Authority in the matter of Tariff Petition issued dated August 07, 2020 | view |
Motion for Leave for Review filed by Iran-Pak Wind Power (Private) Limited against the Determination of the Authority in the matter of Tariff Petition issued dated August 18, 2020 | view |
Tariff Petition of 1.875 MW Shishi Hydropower Project Submitted by Pakhtunkhwa Energy Development Organization | view |
Tariff Petition of Uzghor Hydro Power Company Pvt. Limited for its 82.25 MW Turtonas-Uzghor Hydropower project | View |
Tariff Petition of Lawi Hydropower Project submitted by Pakhtunkhwa Energy Development Organization (PEDO) | View |
Petition filed by GEPCO for the determination of its tariff for Supply of electric power for the FY 2019-20 | View |
Petition filed by GEPCO for the determination of its tariff for Supply of electric power for the FY 2018-19 | View |
Petition filed by GEPCO for the determination of its tariff for Distribution of electric power for the FY 2019-20 | View |
Petition filed by GEPCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 | View |
Petition filed by WAPDA Hydroelectric for Revision of Tariff for FY 2020-21 for Supply of Power from WAPDA Hydel Power Stations | |
K-Electric Submission of Power Acquisition Request in Relation to Power Acquisition from Lucky Cement Limited | View |
Tariff Petition Filed by Access Solar (Pvt.) Limited for the Determination of Generation Tarif in Respect of 11.52 MWp Solar PV Power Plant | View |
Motion for leave for Review against the Determination of NEPRA in the Matter of Tariff Petition filed by Burj Wind Energy (Private) Limited for Determination of Reference Generation Tariff in Respect of 13.80 MW Wind Power Project | view |
Motion for leave for Review of the Tariff Determination for Trans Atlantic Energy (Private) Limited in respect of its 48.3 MW Wind Power Project at Jhimpir District Thatta, Sindh under Rule 16(6) of the NEPRA (Tariff Standards and Procedure) Rules 1998 read with NEPRA (Review Procedure) Regulations 2009) | view |
CPPA-G Petition for Determination of its Market Operation Fee for the FY 2019-20. | view |
Petition filed by Safe Solar Power (Pvt.) Limited for the Determination of Generation Tariff in respect of 10 MWp Solar PV Power Plant | View |
Communication in connection with the Motion for Leave for Review dated December 12, 2019 in the Matter of Engro Powergen Qadirpur Limited ("EPQL") | View |
Motion for Leave for Review against the determination of NEPRA titled "Decision of the Authority in the Matter of Engro Powergen Qadirpur Limited("EPQL") dated December 10, 2014 | |
K-Electric Quarterly Variation for the Quarter July 2019 to September 2019 under Multi-Year Tariff 2017 | View |
Tariff petition of 11.80 mw Karora Hydropower Project submitted by PEDO | View |
Tariff petition of 10.20 mw Jabori Hydropower Project submitted by PEDO | View |
Petition filed by TESCO for Determination of Tariff for Supply of Power for the FY 2019-20 | View |
Petition filed by TESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View |
Petition filed by MEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View |
Petition filed by MEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View |
Petition filed by MEPCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View |
Motion for leave for Review Petition by Siachen Energy Limited | View |
Petition filed by PESCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View |
Petition filed by PESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View |
Petition filed by SEPCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View |
Petition filed by SEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View |
Petition filed by HESCO for Determination of Tariff for Supply of Power for the FY 2019-20. | View |
Petition filed by HESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View |
Petition filed by HESCO for Determination of Tariff for Distribution of Power for the FY 2019-20 | View |
Petition filed by HESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View |
Petition filed by QESCO for Determination of Tariff for Distribution of Power for the FY 2019-20 | View |
Petition filed by QESCO for Determination of Tariff for Supply of Power for the FY 2019-20 | View |
Gul Ahmed Energy Limited - Motion for leave for review in respect of the Tariff Determination dated November 21, 2019 | View |
Tapal Energy (Private) Limited - Motion for leave for review in respect of the Tariff Determination dated November 20, 2019 | View |
Petition filed by QESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View |
Petition filed by QESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View |
Petition filed by QESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View |
Petition filed by QESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View |
Petition for Modification in the Matter of Tariff Determination of Indus Wind Energy Limited | |
Petition for Modification in the Matter of Tariff Determination of Master Green Energy Ltd. | |
Petition for Modification in the Matter of Tariff Determination of NASDA Green Energy (Pvt.) Ltd. |
|
Petition for Modification in the Matter of Tariff Determination of Gul Ahmed Electric Limited | |
Petition for Modification in the Matter of Tariff Determination of Lakeside Energy Private Limited | |
Petition for Modification in the Matter of Tariff Determination of Tricorm Wind Power (Private) Limited | |
Petition for Modification in the Matter of Tariff Determination of Metro Wind Power Limited | |
Petition for Modification in the Matter of Tariff Determination of Liberty Wind Power 1 (Private) Limited | |
Petition for Modification in the Matter of Tariff Determination of Liberty Wind Power 2 (Private) Limited | |
Petition for Modification in the Matter of Tariff Determination of Artistic Wind Power Private Limited. | |
Petition for Modification in the Matter of Tariff Determination of ACT2 Wind (Private) Limited | |
Petition for Modification in the Matter of Tariff Determination of DIN Energy Limited | |
CPPAG Energy
Purchase Data for the month of October 2019 |
View |
Review
Petition pertaining to Modification
of Tariff RLNG based Power Plant at
Balloki at Haveli Bahadur Shah |
View |
Review
Petition pertaining to Modification
of Tariff RLNG based Power Plant at
Balloki |
View |
Application for Tariff Petition
for 50 MW
HNDS
Energy (Pvt) Ltd |
View |
Application for Tariff Petition
for 50 MW
Meridian Energy (Pvt) Ltd |
View |
Application for Tariff Petition
for 50 MW Helios Power (Pvt)
Ltd |
View |
Application for Tariff Petition
for 50 MW
ZhenfaPakistan New Energy Company (Pvt)
Ltd |
View |
Application for Tariff Petition
for 50 MW P&G Energy Pvt Ltd |
View |
Tariff Petition filed by
Sapphire Hydro Power Limited |
View |
Tariff Petition filed
by Zorlu Solar Pakistan (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 100 MWp Solar Power Project |
View |
Tariff Petition filed
by K1 Solar Power Lahore (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 15 MWp Solar Power Project |
View |
Tariff Petition filed
by Iran-Pak Wind Power (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 50 MW Wind Power Project |
View |
Tariff Petition filed
by Norinco International Thatta Power (Pvt) Limited
for the Determination of reference Generation Tariff
in respect of 100 MW Wind Power Project |
View |
Tariff Petition filed
by Moro Power Company (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 25 MW Wind Power Project |
View |
Motion for Review under Rule 16(6) of
thr National Electric Power Regulatory Authority (Tariff Standards and
Procedure) Rules, 1998 in the matter of Decision dated 18th January, 2019 in
the Matter of Tariff Modification Petition of 147MW Patrind Hydro Power
Project. |
|
Tariff Petition
filed by Gul Ahmed Energy Limited for
Approval of Generation Tariff for RFO based Power
Plant of 136.17 MW /9Gross) at Karachi |
|
K-Electric application for Review
regarding the decision of the Authority in the Matter of request filed by KE
for Approval to Utilize RLNG as an Alternate Fuel for its Generation Plants |
|
CIHC Pak Power Company Limited
submission of Motion for Leave for Review of 300 MW Coal Fired Power Project
at Gwadar (Project) |
|
Tariff Petition filed by Dhadar
Hydropower (Private) Limited |
Tariff Petition filed by Burj Wind Energy (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 13.80 MW Wind Power Project | |
Tariff Petition of Neelum Jhelum Hydropower Power Project | |
Tariff Petition of Trance Atlantic Energy (Pvt.) Limited for the Determination of Reference Generation Tariff in Respect of 48.3MW Wind Power Project | |
Tariff Petition of Tricom Wind Power Private Limited for 50 MW Wind Power Project (TWP) at Jhimpir Area, Thatta, Sindh | |
Tariff Petition filed by Gujranwala Electric Power Company Limited (GEPCO) for the Determination of its Consumer-end Tariff Pertaining to the FY 2016-17 and FY 2017-18 | |
Notice of Admission/ Public Hearing - Tariff Petition filed by Siachen Energy Limited for the Determination of Reference Generation Tariff in respect of 100 MWp Solar Power Project | |
Tariff Petition filed by Peshawar Electric Supply Company Limited (PESCO) for the Determination of its Consumer-end Tariff Pertaining to the FY 2016-17 and FY 2017-18 | |
Tariff Petition filed by Gul Ahmed Electric Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Din Energy Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Nasda Green Energy (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Metro Wind Power Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Liberty Wind Power 2 (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Act2 Wind (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition for Negotiated Tariff under Cost-Plus Regime for Shaheen Renewable Energy 1 (Pvt.) Limited 51 MW Wind Power Project at Bholari, District Thatta, Sindh | |
Tariff Petition filed by Western Energy (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Master Green Energy Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Indus Energy Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff Petition filed by Liberty Wind Power 1 (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 50 MW Wind Power Project. | |
Tariff
Petition filed by Artistic Wind Power
(Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff
Petition of Lakeside Energy
(Private) Limited for 50 MW Wind Power
Project |
|
Tariff Petition Filed by Sukkur Electric Power
Company Limited (SEPCO) for
Determination of its Consumer End Tariff
pertaining to the FY 2016-17 & FY 2017-18 |
|
Tariff Petition Filed by CIHC Pak Power Company Limited for Approval of Generation Tariff for 300 MW (Gross) Coal-Fired Power Plant at Gawadar, Balochistan | |
Tariff Petition filed by Zhenfa Pakistan New Energy Company (Pvt.) Limited for the Determination of Reference Generation Tariff in Respect of 100 MWp Solar PV Power Plant | |
Petition filed by Lake City Management (Private) Limited for the Determination of its Consumer-end Tariff for the Period from January to June 2018 |
Petition filed by Multan
Electric Power Company (MEPCO) for the Determination of its
Consumer-end Tariff Pertaining to the FY 2016-17 & FY 2017-18 |
|
Tariff Petition filed by Zhenfa Pakistan New Energy Company (Pvt.) Limited for the Determination of Reference Generation Tariff in respect of 100 MWp Solar Power Plant. | |
Pakhtunkhwa
Energy Development Organization (PEDO) Application
for EPC Level Tariff Petition for 36.6 MW Daral Khwar Hydropower
Project, District Swat, |
|
Quetta Electric Supply Company
Limited (QESCO) petition for the determination of its Consumer-end
tariff pertaining to the FY 2016-17 |
|
Quetta Electric Supply Company
Limited (QESCO) petition for the determination of its Consumer-end
tariff pertaining to the FY 2017-18 |
|
Power Acquisition Request by K-Electric for Purchase of 11-14 MW Surplus Power from Lottee Chemical Pakistan Limited. | |
Motion for Leave for review filed by Zonergy Company Limited against the Decision of the Authority in the matter of Solar PV Power Generation Tariff dated March 3, 2017 | |
Motion for Leave for review
filed by Zhenfa Pakistan New Energy Company (Pvt.) Limited against
the Decision of the Authority in the matter of Solar PV Power Generation
Tariff dated March 3, 2017 |
|
Tariff Petition
filed by Kolachi Portgen Limited for
Determination of Generation Tariff 450 MW RLNG based
Combined Cycle Power Plant |
|
Review Petition before NEPRA for Determination of Upfront Tariff for Wind Power Projects by Government of Sindh. | |
Revised/ corrected Bulk
Supply Tariff Petition - WAPDA
Hydroelectric for FY 2017-18 |
|
Tariff Petition
FY 2016-17 Tribal Areas
Electricity Supply Company Limited (TESCO) |
CPPAG Energy
Purchase Data for the Month of December 2016 |
|
CPPAG
Energy Purchase Data for the Month of November 2016 |
|
CPPAG
Energy Purchase Data for the Month of October 2016 |
|
Petition Filed
by K-Electric for
Provisional Monthly Fuel Cost Adjustment (FCA) due
to Variation in Fuel and Power Purchase Price for
the Month of November 2016 |
|
Motion for leave for
review pursuant to Rule 16(6) of NEPRA Tariff
(Standards and Procedure) Rules, 1998 , NEPRA
(Review Procedure) Regulation, 2009 submitted by
Private Power Infrastructure Board (PPIB). |
|
Filing of Tariff
Petition for Determination of Transfer/ Wheeling
Charges for the Year 2015-16 & 2016-17 - National
Transmission and Despatch Co. Ltd. |
|
Motion for leave for Review filed by Fatima Energy Limited against the Authority Decision dated 17th June 2016 FEL Ground | |
Tariff Petition filed by
National Power Parks Management Company (Pvt) Ltd (NPPMCL) for
approval of Reference Generation Tariff for 1223.106 MW
Combined Cycle Plant at Balloki District Kasur |
|
Tariff Petition filed by
National Power Parks Management Company (Pvt) Ltd (NPPMCL) for
approval of Reference Generation Tariff for 1230.54 MW
Combined Cycle Plant at Haveli Bahadur Shah District Jhang |
|
Petition filed
by K-Electric Limited for Quarterly
Adjustment of Tariff for Quarter Ended March,
2016 |
|
WAPDA Hydroelectric Bulk
Supply Tariff Petition for Revised Supplementary Tariff for
Payment of NHP and Arrears to KPK during FY 2015-16 |
|
Karot Power Company (Pvt.) Limited Motion for Leave for Review against Authority's Decision No. NEPRA/TRF-309/KPCL-2015/2544-2546 dated 4th February 2016, in the matter of EPC Stage Tariff Determination of 720 MW Karot Hydropower Project | |
Submission of the Feasibility Stage Tariff Petition of 545 MW Kaigah Hydro Power Project | |
Petition filed by Quaid-e-Azam
Thermal Power (Pvt.) Ltd. (QATPL) for
Approval of Generation Tariff for RLNG based
Power Plant of
1180.13 MW (Gross) at Bhikki |
|
Tariff Petition
filed by Sindh Transmission and Dispatch
Company (Private) Limited (STDC) for the
Determination of tariff for 95km
transmission line project |
|
PPIB Petition
for Determination of Tariff for 660 KV HVDC
Transmission Line |
|
Petition for
Determination of Consumer-end Tariff for FY 2015-16
in respect of
Hyderabad Electric Supply Company
Limited (HESCO) |
|
Lakhra Power Generation Company
Limited - Motion for Leave to Review against NEPRA's
Determination for FY 2014-15 |
|
LESCO Resubmission of Petition for
Determination of Consumer-end Multiyear Tariff for FY 2015-16 to 2019-20 |
|
Tariff Petition
filed by Fatima Energy Limited (FEL) for the
Determination of Tariff for its 120 MW (Gross ISO)
Co-generation Power Project at Sanawan, Tehsil Kot
Addu, District Muzaffargarh |
|
Petition for
Determination of Consumer-end Tariff for FY 2015-16 in
respect of Quetta Electric Supply Company Limited (QESCO) |
|
CPPAG Energy Purchase Data for
the Month of December 2015 |
Tariff Petition for the Determination of Consumer End Tariff for FY 2015-16 based on Actual / Estimated Result of FY 2014-15 base year | View |
Petition for the Determination of Consumer End Tariff for FY 2015-16 to 2019-20 under multiyear tariff regime in respect of Peshawar Electric Supply Company Limited (PESCO) | View |
Monthly Fuel Cost Adjustment (FCA) K-ELECTRIC due to variation in Fuel and Power Purchase Price for the Month of June 2015 | View |
Monthly Fuel Cost Adjustment (FCA) K-ELECTRIC due to variation in Fuel and Power Purchase Price for the Month of July 2015 | View |
Adjustment in K-ELECTRIC schedule of Tariff on account of Fuel Price and Power purchase cost variation for Quarter Ended June 2015 | View |
Petition for the Determination of Consumer End Tariff for FY 2015-16 to 2019-20 under multiyear tariff regime in respect of Peshawar Electric Supply Company Limited (PESCO) | View |
Petition for the Determination of Consumer End Tariff for FY 2015-16 to 2019-20 under multiyear tariff regime in respect of Faisalabad Electric Supply Company Limited (FESCO) | View |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Indus Wind Energy Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Lakeside Energy Pvt. Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Master Green Energy | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Mr. Arooj Asghar | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by NASDA Energy Pvt. Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Triconboston Consulting Corporation Pvt. Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Western Energy Pvt. Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Wind Eagle Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Bridge Factor Pvt. Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Din Energy Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Emerald Energy Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Energy Deptt Govt of Sindh | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Frontier Renewable Energy Pvt. Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Green Power Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Harbin Electric International Company Ltd. | |
Review Petition - Upfront Tariff for Wind Power Generation Tariff filed by Hartford Alternative Energy Pvt. Ltd. | |
Tariff Petition filed by K-Electric regarding Monthly Fuel Cost Adjustment (FCA) due to variation in Fuel and Power Purchase Price for the Month of April 2015 | |
Tariff Petition filed by K-Electric regarding Monthly Fuel Cost Adjustment (FCA) due to variation in Fuel and Power Purchase Price for the Month of May 2015 | |
Tariff Petition on behalf of Central Power Generation Company Limited (CPGCL) GENCO-II | |
Petition filed by Wapda Hydro Electric for revision of Tariff for FY 2015-16 for Bulk Supply of Power from Wapda Hydel Power Stations | |
Petition for Determination of Tariff — 16 MW Waste Heat Recovery Renewable Energy Power Project — Lucky Cement Ltd | |
Petition for Determination of Tariff — 421.90 MW Coal Conversion Project of BOPS-1 at Bin Qasim, Karachi K-Energy (Pvt.) Ltd. (KEPL) | |
EPC Stage Tariff petition filed by 720 MW Karot Hydro Power Project | |
Petition for revised Generation Tariff Northern Power Generation Company Limited (GENCO-III) | |
Tariff Petition filed by Olympus Energy (Pvt) Ltd (OEPL) for the Determination of Feasibility Stage Generation Tariff i.r.o 20 MW Run of River Lucky Hydropower Project | |
Tariff Petition filed by China Machinery Engineering Corporation i.r.o a Local Coal Fired Power Project of 1x300 MW (NET) in Pind Dadan Khan, Salt Range, Punjab | |
Tariff petition filed by PPDC in respect of 4.04 MW DEG Outfall Hydropower Project | |
Petition for Determination of EPC Stage Tariff for Chianwali Hydropower Project | |
Tariff Petition filed by Japan Power Generation Limited for Tariff Modification of RFO base Power Plant 0f 135 MW (gross) at JIA Bagga off Raiwind Road Lahore | |
Tariff Petition filed by Southern Electric Power Company Limited for Tariff Modification of RFO base Power Plant of 117 MW at 23 km Raiwind Road Lahore | |
Petition for Tariff Determination of Fmicotex Industries (Private) Limited for 35.538 MW Power Project. | |
Petition for Tariff Determination on Behlaf of Mekotex (Private) Limited for a Power Project of Approximately 5.0 MW |
|
Tariff Petition filed by Lakhra Power Generation Company Limited for Determination of Tariff of Coal Power Plant at Sehwan/ Dadu Road, Lakhra | |
TESCO Tariff Petition for Determination of Consumer end Tariff for FY 2013-14 | |
NTDC for Engineering, Procurement and Construction of (EPC) stage Tariff Petition for 100 MW Gulpur Hydro Power Project. |
View |
Revised Application for Award of
Negotiated Tariff for Zephyr Power (Pvt.) Limited |
|
Petition for Tariff Determination for
1320 MW Coal Fired Power Plant at Jamshoro Power Company Limted
(GENCO-I) |
|
Tariff
Application of Burj Wind Energy (Private) Limited for a 13.5 MW Wind
Power Project at Gujjo, District Thatta, Sindh, Pakistan |
View |
Tariff Petition filed by
Lalpir Power Limited for Coal Conversion of Existing RFO based Power
Plant of 362 MW |
View |
Tariff Petition filed by
Pakgen Power
Limited
for Coal Conversion of Existing RFO based Power Plant of 365 MW |
View |
Tariff Petition filed by
Saba Power
Company (Private) Limited for Coal Conversion of Existing RFO based Power
Plant of 136.3 MW |
View |
NTDC Filing of Tariff Petition for
Determination of Transfer/ Wheeling Charges for the Year 2014-15 |
View |
MEPCO Tariff Petition for F.Y. 2014-15 |
View |
Consumer-end Tariff Petition for FY 2014-15 -
Hyderabad Electric Supply Company Limited. |
|
Petition Fee in respect of Petition Filed by GEPCO for the Determination of Consumer End Tariff Pertaining to FY 2014-15 | |
Petition for Determination of EPC Tariff for Marala Hydropower Project of 7.64 (Gross) MW Capacity at Upper Chenab Canal (UCC), District Sialkot in Province of the Punjab. | |
Petition for
Determination of EPC Tariff for PakPattan
Hydropower Project of 2.82 MW (Gross) Capacity
at Pakpattan Canal, District Pakpattan in
Province of the Punjab |
|
Quetta Electric
Supply Company (QESCO) Tariff Petition
for the the Year 2014-15 |
|
Tariff Petition
for 425-460 MW CCP at Nandipur of NPGCL |
|
NTDC Request 1100 MW Kohala Hydropower Project— Approval of Feasibility Stage Tariff Proposal < Issues Framed in the Matter of Request Filed by National Tranmission And Despatch Company (NTDC) for Approval of Negotiated Feasibility Stage Tariff in Respect of Power Procurement from 1100 Mw Kohala Hydropower Project | |
Tariff
Petition for Determination of Consumer end Tariff
for the Period Jul 2014 to Jun 2015 in Respect of
Bahria Town (Pvt) Ltd. |
|
Petition for Determination of Consumer-end Tariff for FY 2014-15 in respect of Faisalabad Electric Supply Company Ltd. (FESCO) | |
Tariff Petition for Determination of Consumer-end Tariff for FY 2014-15 in respect of Peshawar Electric Supply Company Ltd. (PESCO) | |
Tariff Petition Filed
by by Sitara Energy Limited for Determination
of Generation Tariff |
|
Petition for Approval / Determination of Tariff
for Jamshoro Power Company
Ltd. (JPCL) |
Petition filed by Tribal Areas
Electric Supply Company (TESCO) for the determination of its
consumer-end tariff pertaining to the FY 2013-14 |
|
Petition for Determination of EPC
Stage Generation Tariff for 1.8 MW ALKA Power Hydropower Project |
|
Petition File by
KESC for Monthly Fuel Charges
Adjustment (FCA) |
|
Petition Filed by
Karachi Electric Supply Company Ltd (KESCL) for
Monthly Fuel Charges
Adjustmen for the months of July 2013
(Copy
of Petitions) |
|
Petition filed by
Islamabad Electric Supply Company
(IESCO) for the determination of its consumer-end tariff
pertaining to the FY 2013-14 (Copy of Petition) |
|
Petition filed by
Peshawar Electric Supply Company (PESCO)
for the determination of its consumer-end tariff pertaining to the
FY 2013-14
(Copy of Petition) |
|
Petition filed by Lahore Electric Supply
Company (LESCO) for the determination of its consumer-end tariff
pertaining to the FY 2013-14
(Copy
of Petition) |
|
Petition filed by
Gujranwala Electric Supply Company (GEPCO)
for the determination of its consumer-end tariff pertaining to the
FY 2013-14
(Copy of Petition) |
|
Petition filed by
Faisalabad Electric Supply Company (FESCO)
for the determination of its consumer-end tariff pertaining to the
FY 2013-14
(Copy of Petition) |
|
Petition filed by
Multan Electric Power Company (MEPCO)
for the determination of its consumer-end tariff pertaining to the
FY 2013-14
(Copy of Petition) |
|
Petition for Determination of Generation Tariff for
118.8 MW Cogeneration Power Project to be
setup by
Fatima Energy Ltd at Sanawan, Tehsil
Hot Addu, District Muzafargarh
(Copy
of Petition) |
|
Fuel Charges Adjustment of Karachi Electric Supply Company Ltd (KESCL) for the months of February and March, 2013, as well as Quarterly Adjustment request for the Quarter January-March, 2013 1. February 2013 2. March 2013 3. Quarter Janruary-March 2013 |
|
Request filed by
National Transmission and Despatch Company (NTDC)
for Approval of Negotiated Feasibility Stage Tariff
i.r.o Power Procurement from 640 MW Azad Pattan Hydropower
Project Azad Jammu & Kashmir
(Copy of Tariff Petition) |
|
Request filed by
National Transmission and Despatch Company (NTDC)
for Approval of Negotiated Feasibility Stage Tariff
i.r.o Power Procurement from 500 MW
Chakoti Hattian Hydropower Project Azad
Jammu & Kashmir (Copy
of Tariff Petition) |
|
Petition
filed by WAPDA
Hydroelectric for Determination of
Generation Tariff for FY 2013-14
(Copy of Tariff Petition) |
|
Tariff Petition file by Access Solar (Pvt) Limited
for 10 MW Solar Power Project at Pind Dadan Khan |
|
Petition filed by National Transmission &
Despatch Company Ltd (NTDC) for
determination of Transfer/Wheeling Charges for the
Year 2012-13
(Copy of Petition) |
|
Fuel Charges Adjustment of Karachi Electric Supply Company Ltd (KESCL) for the months of October, November and December, 2012, January 2013 as well as Quarterly Tariff Adjustment for the Quarter ended December, 2012 1- Petition for Monthly Adjustment October, November, December 2012) 2- Petition for Adjustment in Schedule of Tariff for the Quarter ended December 2012 3-Petition for Monthly Adjustment January 2013) | |
23-01-2013 1-Monthly Adjustment (October, November, December 2012) 2-Adjustment in Schedule of Tariff for the Quarter ended December 2012 |
Petition for
Approval/Determination of Tariff for DHA Cogen Ltd (the "Company")
Combined Cycle Power Plant at DHA Phase VIII, Karachi Sindh |
|
FESCO in respect of
M/S Galaxy Textile Mills under
NEPRA's Interim Power Procurement regulations-2005 |
|
FESCO in respect of
M/S Shakargnj Sugar Mills
02 MW. Bagasse based power to FESCO. Bhone under
NEPRA's Interim Power Procurement regulations-2005 |
|
FESCO in respect of M/S Shakargnj Sugar Mills Ltd 07 MW Bio Gas
based Power Toba Road Jhang under
NEPRA's Interim Power Procurement regulations-2005 |
|
FESCO in respect of
M/S Sitara Energy Ltd under
NEPRA's Interim Power Procurement regulations-2005 |
|
Petition filed by KESCL for Monthly
adjustment for September 2012 and Quarter Ended
September 2012
Copy of petition for
(
Monthly Adjustment -----
Quarterly Adjustment) |
|
Hearing Regarding Fuel Charges Adjustment for
the Month of September 2012
for Ex-WAPDA Distribution
Companies. |
|
Tariff Petition for 1.3 MW SAR Hydropower Project at Machal Canal,
Mardan, Pakistan |
|
Tariff Petition filed by
Multan Electric Power Company (MEPCO)
for the Determination of Consumer-end
Tariff for
FY 2012-13 |
|
Tariff Petition
for Determination of Consumer End Tariff for
FY 2012-13 |
|
OLYMPUS Energy Tariff Petition: Petition filed by
Olympus Energy
Pvt Ltd for 20 MW Lucky Hydropower
Project |
|
Tariff Petition filed by Gujranwala Electric Power Company (GEPCO)
for the Determination of Consumer-end Tariff for FY 2012-13
|
|
Saif Power Tariff Petition:
Application for the Revision/Modification of the
Generation Tariff - Approximately 225 MW Dual-Fuel Combined Cycle
Thermal Power Project at Bhikki, Punjab |
|
Orient
Power
Tariff Petition: Tariff
Modification Petition under Section 31 of the Regulation of Generation,
Transmission and Distribution of Electric Power Act, 1997 (XL of 1997) read
with Rule 3 of the National Electric Power Regulatory Authority (Tariff
Standards and Procedures) Rules, 1998 |
|
Halmore Power
Tariff Petition:
Application for the Revision/Modification of the
Generation Tariff - Approximately 225 MW Dual- Fuel Combined Cycle
Thermal Power Project at Bhikki, Punjab |
|
IESCO
Tariff Petition: Petition for Determination of consumer end Tariff for FY 2012-13 in respect of Islamabad Electric Supply Company |
|
KESCL
Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel and Power
Purchase Price of JUNE, 2012 |
|
KESCL: Adjustment
in KESCL Schedule of Tariff on account of Fuel Price and Power Purchase Cost
variation for Quarter ended June 2012. |
|
FESCO
Tariff Petition for Determination of consumer end Tariff for FY 2012-13
in respect of Faisalabad Electric Supply Company |
|
KESCL
Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel and Power
Purchase Price of APRIL 2012 |
|
KESCL
Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel and Power
Purchase Price of MAY, 2012 |
|
Power Procurement request of
HESCO in respect of M/s Salim Yarn Mills (Pvt.) Limited under
NEPRA's Interim Power Procurement regulations-2005 |
|
Power Procurement request of
HESCO in respect of M/s Mekotex (Pvt.) Limited under NEPRA's
Interim Power Procurement regulations-2005 |
|
Power Procurement request of
HESCO in respect of M/s Fateh Textile Mills Limited under NEPRA's
Interim Power Procurement regulations-2005 |
|
MEPCO Power Acquisition request (PAR) in respect of Contract Agreement for
purchase of 5 MW Natural Gas based power under Standard Power Purchase Agreement with with M/s Roomi Fabrics Limited Khanewal Road Multan
(Pre-Executed Agreement) |
|
MEPCO
Power Acquisition request (PAR) in respect of Contract Agreement for
purchase of 16.5 MW Natural Gas based power under N-CPP Policy with M/s
Khokhar Textile Mills Limited. |
|
MEPCO
Power Acquisition request (PAR) in respect of Contract Agreement for
purchase of 10.5 MW Natural Gas based power under N-CPP Policy with M/s
Roomi Fabrics Limited. |
|
Adjustment in KESCL
Schedule of Tariff on Account of Fuel Price and Power Purchase Cost
Variation for Quarter Ended March 2012 |
|
KESCL
Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel and
Power Purchase Price of March 2012 |
|
KESCL
Monthly Fuel Cost Adjustment (FCA)
due to Variation in Fuel and Power Purchase Price of February 2012 |
|
KESCL
Monthly Fuel Cost Adjustment (FCA)
due to Variation in Fuel and Power Purchase Price of January 2012 |
|
Tariff Petition
for Prescribing Separate Tariffs Structure for Karachi Water and Sewerage Board (KWSB) |
|
Upfront
Coal Tariff for Private Power Generation Projects 50 MW |
|
Upfront
Coal Tariff for Private Power Generation Projects
200 MW/600
MW/1000 MW |
|
Tariff Petition: 12 MW Lumen Energia Biomass Power Plant |
|
CPPA Energy Purchase Data
for the Month of January 2012 for Fuel Charges Adjustment of
XWDISCOs |
|
CPPA Energy Purchase
Data for the Month of December 2011 for Fuel Charges Adjustment of
XWDISCOs |
|
CPPA Energy Purchase Data
for the Month of November 2011 for Fuel Charges Adjustment of
XWDISCOs |
|
CPPA Energy Purchase Data
for the Month of October 2011 for Fuel Charges Adjustment of
XWDISCOs |
|
February 21,
2012 Adjustment in KESCL Schedule of Tariff on Account of Fuel Price and
Power Purchase Cost Variation for Quarter ended
December 2011 |
|
February 15, 2012Revised
Adjustment in KESCL Schedule of Tariff on Account of Fuel Price
and Power Purchase Cost Variation for Quarter ended September 2011 |
|
KESC Monthly Fuel
Cost Adjustment (FCA) due to Variation in Fuel and Power Purchase Price of December 2011 |
|
KESC Monthly Fuel
Cost Adjustment (FCA) due to Variation in Fuel and Power Purchase Price
of November 2011 |
|
KESC Monthly Fuel
Cost Adjustment (FCA) due to Variation in Fuel and Power Purchase Price of October 2011 |
|
KESC Monthly Fuel
Cost Adjustment (FCA) due to Variation in Fuel and Power Purchase Price of September 2011 |
|
Power
Procurement Request under NEPRA'S Interim Power Procurement
regulation-2005 |
December
2011 - SSJD Bio Energy Limited Application for Tariff Approval -
12
MW Biomass Power Project near Mirwah Gorchani town, District Mirpurkhas,
Privince of Sindh |
View |
October
2011 - Tariff
Petition of Zephyr Power (Pvt.) Limited |
View |
Tariff
Petition for Master Wind Energy Limited's 49.5
MW Wind Power Project at Jhimpir, District Thatta, Privince of Sindh. |
View |
October
2011 - Tariff
Petition of Zephyr Power (Pvt.) Limited |
View |
October
25, 2011 - Olympus Energy (Pvt.) Limited
20 MW Lucky
Hydropower Project ("Project") at Marala Headworks |
View |
September
2011 - Tariff
Petition for
1 MW Solar Power Plant at Sanjwal |
View |
September 2011 - Tariff Petition FY 2011-12 - Sukkur Electric
Power Company Limited (SEPCO) |
View |
September
2011 - Tariff
Petition - Tariff Petition
by Yunus Energy Ltd for 50 MW Wind Power Project at Jhampir Area,
Taluka & District Thatta, Sindh |
View |
September 2011 - Tariff Petition for Tenga Genarasi Limited's
49.5
MW Wind Power Project at Kauttikun, Mirpursakro Talka & District
Thatta, Sindh |
View |
September
2011 - Tariff
Petition - Tariff Petition
by Yunus Energy Ltd for 50 MW Wind Power Project at Jhampir Area,
Taluka & District Thatta, Sindh |
View |
September 2011 -
Application for Approval / determination of Generation Tariff of
50
MW Wind Power Project
of Sapphire Wind Power Company Limited at Jhimpir
area, Taluka & District
Thatta, Sindh |
View |
September
2011 - Tariff
Petition - Frontier Mega Structure & Power (Private) Limited
2.4 MW Ghanool Hydropower Project |
View |
22-09-2011 -
Petition for Determination of Tariff for
720 MW Karot Hydropower Project. |
View |
23-09-2011 - KESC Monthly Fuel Cost
Adjustment (FCA) due to variation in fuel and power purchase price of
August 2011 |
View |
08-09-2011 - Tariff
Petition for
50 MW Wind Power Project at Gharo, District Thatta, Sindh of Foundation Wind Energy-II (Private) Limited |
View |
08-09-2011 -
Tariff Petition for 50 MW Wind Power Project at Gharo, District Thatta, Sindh of Foundation Wind Energy-I Limited |
View |
25-08-2011 - KESCL Monthly Fuel Surcharge Adjustment (FSA)
due to variation in Fuel and Power Purchase Price for
July 2011 (Revised) |
View |
22-07-2011 - Adjustment in KESCL Schedule of Tariff on Account of Fuel Price and Power Purchase Cost
variation for Quarter ended
June 2011. |
View |
22-07-2011 - KESCL Monthly Fuel Surcharge Adjustment (FSA)
due to variation in Fuel and Power Purchase Price for
June 2011 |
View |
Petition for Determination of Tariff for
4.8 MW Sahiwal Hydropower
Project |
View |
08-06-2011 - Tariff
Petition for 49.5 MW Wind Power Project at Jhimpir of Three Gorges First
Wind Farm Pakistan (Pvt.) Limited |
View |
Tariff Petition of Bahria Town (Private Limited)
for the Period from
January 01, 2011 to June 30, 2012 |
View |
20-05-2011 - KESCL Monthly Fuel Surcharge Adjustment (FSA)
due to variation in Fuel and Power Purchase Price for
April 2011 |
View |
12-05-2011 - Application for Inclusion of Separate category in Tariff
to Allow Distribution by the Sponsoring Industrial Estate within the
agreed service area. |
View |
04-04-2011 - Tariff Petition filed by PESCO
for the Determination of its Consumer End Tariff Pertaining to the
2nd, 3rd & 4th Quarter of the FY
2010-11 |
View |
06-05-2011 - Adjustment in KESCL Schedule of Tariff on Account of Fuel Price and Power Purchase Cost
variation for Quarter ended March 2011. |
View |
06-05-2011 - KESCL Monthly Fuel Surcharge Adjustment (FSA)
due to variation in Fuel and Power Purchase Price for
March 2011 |
View |
09-03-2011 - Revised Tariff Petition for ZORLU Enerji Pakistan 56.4 MW Wind Power Project at Jhimpir District Thatta, Sindh. | |
Tariff Petition for Determination of Consumer end Tariff from 01 Jan 11 to 20 Jun 12 in respect of Bahria Town (Pvt.) Ltd. Islamabad. | |
22-03-2011 - KESCL Monthly Fuel Surcharge Adjustment (FSA) due to Variation in Fuel and Power Purchase Price for February 2011 | |
05-03-2011 - HESCO Tariff Petition for Determination of Consumer-End Tariff for 2nd, 3rd & 4th Quarters of the FY 2010-11 | |
LESCO Tariff Petition for FY 2008-09 | |
25-02-2011 – KESCL Monthly Fuel Surcharge Adjustment (FSA) due to variation in Fuel and Power Purchase Price for January 2011 | |
14-02-2011 - Petition Data of GEPCO for Determination of Quarterly Consumer-End Tariff for 2nd, 3rd, and 4th Quarters of FY 2010-11 Pursuant to Amendment in the NEPRA Act 1997 | |
14-02-2011 – Quarterly Tariff Petition for 2nd, 3rd, and 4th Quarters of the FY 2010-11 in respect of IESCO. | |
14-02-2011 - Adjustment in KESCL Schedule of tariff on Account of Fuel Price and Power Purchase Cost Variation for Quarter ended December 2010 | |
14-02-2011 – KESCL Monthly Fuel Surcharge Adjustment (FSA) due to variation in Fuel and Power Purchase Price for January 2011 | |
19-01-2011 - Quarterly Tariff Petition for 2nd, 3rd and 4th Quarters of the FY2010-11 in Respect of IESCO. | |
18-01-2011 - Monthly Fuel Surcharge Adjustment (FSA) due to variation in Fuel and Power Purchase Pice for December 2010 |
15-11-2010 - KESCL Monthly Fuel
Surcharge Adjustment (FSA) due to variation in Fuel and Power
Purchase Price for October 2010 |
|
15-11-2010 - Engro Energy Limited Review
Petition against NEPRA Tariff (True Up) Determination dated 3 November
2010. |
|
15-11-2010 - KESCL Monthly Fuel
Surcharge Adjustment (FSA) due to variation in Fuel and Power
Purchase Price for October 2010 |
|
14-12-2010 - KESCL Monthly Fuel
Surcharge Adjustment (FSA) due to Variation in Fuel and Power Purchase
Price for November 2010 |
|
11-11-2010 - Petition for Determination of
Tariff for Lakhra Power Generation Company Limited
|
|
28-10-2010 - Adjustment in KESCL Schedule
of Tariff on Account of Fuel Price and Power Purchase Cost Variation for
Quarter Ended September 2010 |
|
22-10-2010 - Petition for KESCL Monthly
Fuel Surcharge Adjustment (FSA) Due to Variation in Fuel and Power
Purchase Price for September 2010 |
|
13-08-2010 - Petition filed by National
Transmission & Dispatch Company Limited (NTDC) for the
Determination of Transfer/ Wheeling Charges for the Year
2010-11
|
|
23-08-2010 - Adjustment in KESCL Schedule of Tariff
on Account of Fuel Price and Power Purchase Cost Variation for
Quarter Ended June 2010 |
|
11-08-2010 - Monthly Fuel Surcharge
Adjustment (FSA) Due to Variation in Fuel and Power Purchase Price for
July 2010 - KESCL |
|
Petition for Tariff
Determination of Behalf of NPGCL - 150 MW Net Each Rental Power
Project at Summandri Road, Faisalabad & Sahuwal, Sialkot.
|
|
Central Power Generation Company
Limited: Application for Tariff Approval - 50 MW (Net) capacity, as
corrected to Mean Site Condition, Near Naudero, Sindh (The
"Project") |
|
24-06-2010 - Petition filed by QESCO for Determination
of Quarterly Consumer-end Tariff for
4th Quarter (April-June) of FY
2009-10
|
|
28-06-2010 -
Petition filed by GEPCO for
Determination of Quarterly Consumer-end Tariff ff for 4th Quarter (April-June) of FY
2009-10
|
|
12-05-2010 -
Petition filed by HESCO for
Determination of Quarterly Consumer-end Tariff ff for 4th Quarter (April-June) of FY
2009-10
|
|
Application for Tariff Approval - Radian
Energy Power Generation Company (Private) Limited
("Company" or "Radian") - 162.8 Gross (ISO) thermal
power project at Faisalabad (the "Project")
|
|
29-05-2010 - Revised
Petition data of GEPCO for Determination of Quarterly Consumer-End Tariff
(July-September-10) along with Annual Revenue Requirement
FY 2010-11
Pursuant to Amendment in the NEPRA Act 1997
|
|
07-05-2010 - Tariff Petition for the
FY 2010-11 Islamabad Electric Power Company |
|
10-05-2010 - Tariff Petition for the
FY 2010-11 Multan Electric Power Company |
|
10-05-2010 -
Tariff Petition for the
FY 2010-11 Peshawar Electric Supply Company |
|
10-05-2010 - Tariff Petition for the
FY 2010-11 Quetta Electric Supply Company |
|
10-05-2010 - Tariff Petition for the
FY 2010-11
Hyderabad
Electric Supply Company |
|
01-03-2010 - Tariff Petition for the
FY 2010-11 Lahore
Electric Supply Company |
|
31-03-2010 - Tariff Petition filed by QESCO for
3rd Quarter
(January-March) 2009-10 |
|
08-03-2010 - Tariff Petition filed by GEPCO for
3rd Quarter
(January-March) 2009-10 |
|
30-04-2010 - Tariff Petition filed by MEPCO for
3rd Quarter
(January-March) 2009-10 |
|
04-05-2010 - Tariff Petition filed by LESCO for
3rd Quarter
(January-March) 2009-10 |
|
06-05-2010 - Tariff Petition filed by IESCO for
3rd Quarter
(January-March) 2009-10 |
|
28-04-2010 - Tariff Petition filed by HESCO for
3rd Quarter
(January-March) 2009-10 |
|
27-01-2010 - Tariff Petition filed by FESCO for
3rd Quarter
(January-March) 2009-10 |
|
05-01-2010 -
Motion for leave for Review under Rule 16(6) of the Tariff
Standards & Procedure Rules 1998 (Tariff Rules) - Determination of
Authority in the Matter of KESCL Tariff Petition for increase in
Base Tariff and Modification of Terms and Conditions of Electricity
Supply and Security Deposit Rates.
|
|
07-01-2010 - 18 MW Pehur
Hydropower Project - Tariff Petition - SHYDO
|
|
27-01-2010 - Tariff Petition filed by FESCO for
2nd Quarter
(October-December) 2009-10
|
|
22-01-2010 - Tariff Petition filed by HESCO for
2nd Quarter
(October-December) 2009-10 |
|
04-01-2010 - Tariff Petition filed by QESCO for
2nd Quarter
(October-December) 2009-10 |
|
17-12-2009 - Tariff Petition filed by IESCO for
2nd Quarter
(October-December) 2009-10 |
|
31-12-2009 - Tariff Petition filed by PESCO for
2nd Quarter
(October-December) 2009-10 |
|
06-01-2010 - Tariff Petition filed by MEPCO for
2nd Quarter
(October-December) 2009-10 |
|
18-01-2010 -
Revised Petition Tariff Petition filed by GEPCO for
2nd Quarter
(October-December) 2009-10 |
01-08-2009 - Application for Determination of Tariff for Sahiwal Hydel Power Project Chenab Energy Priavte Limited | View |
05-06-2009 - Petition for Determination of Tariff for 44 MW Hydropower Project at C-J Link (Tail) | View |
22-12-2009 - Petition for Tariff Determination - JDW Power (Private) Limited in respect of approximately 80 MW Co-Generation Power Project Near Rahim Yar Khan | View |
WAPDA Hydroelectric - Petition to NEPRA for Determination of Bulk Supply Tariff of Power to NTDC (FY 2009-10) | View |
16-03-2007 - Bulk Supply Tariff Petition WAPDA Hydroelectric FY 2007-08 | View |
24-05-2005 - Bulk Supply Tariff - WAPDA Hydroelectric FY 2005-06 to FY 2007-08 | View |
29-04-2003 - Bulk Supply Tariff - Hydropower Generation WAPDA Power Wing. FY 2002-03 to FY 2007-08 | View |
07-10-2009 - Petition for Determination of Tariff for Unsolicited Rental Power Project Proposed by M/s Abbas Steel Group (Pvt.) Ltd | View |
07-10-2009 - Petition for Determination of Tariff for Unsolicited Rental Power Project Proposed by M/s Karkey Karadenjz Elektrik, Turkey Phase-II | View |
06-10-2009 - Petition for Determination of Tariff for 50MW Rental Power Project for Five(5) Years CPGCL (Licence # GL/02/2002) | View |
10-09-2009 - Federal Government request for reconsideration - Decision of NEPRA on Review Petition filed by UCH-II. | View |
07-09-2009 - Tariff Petition - Sea Wind Energy (Pvt.) Ltd. | View |
24-08-2009 - LESCO Revised Petition for Determination of Quarterly Consumer-End Tariff (July-September 2009) Pursuant to amendment in the NEPRA ACT 1997. | View |
20-08-2009 - Tariff Petition filed by IESCO for 1st Quarter (July-September) 2009-10 | View |
20-08-2009 - Revised Tariff Petition filed by MEPCO for 1st Quarter (July-September) 2009-10 August 20, 2009 | View |
19-08-2009 - Revised Tariff Petition filed by QESCO for 1st Quarter (July-September) 2009-10 | View |
15-08-2009 - Revised Tariff Petition filed by HESCO for 1st Quarter (July-September) 2009-10 | View |
08-08-2009 - Petition for Determination of Tariff for 51 MW Rental Power Project for Five(5) Years CPGCL (Licence # GL/02/2002) | View |
22-04-2009 - Tariff Petition of KESC for Increase in Base Tariff and Modification in Adjustment Mechanism of KESC and application of Revised Terms and Conditions and Security Deposit Rates. | View |
Intervention Request Form | View |
21-11-2008 -
Application for Tariff Approval - 400 MW Gross (ISO) Capacity Low Btu
Gas-Fired Power Plant near Dera Murad Jamali, Boluchistan Province (the
"Project") UCH Power Private Limited |
|
28-07-2008 - Petition for Tariff
Determination for Japan Power Generation Limited |
|
17-07-2008 - Petition for Determination
of Tariff for 840 MW Suki Kinari Hydropower Project |
|
17-07-2008 - Tariff Petition - Dawood
Power (Pvt) Ltd. |
|
02-06-2008 - Tariff Petition in respect
of Purchase of Power from NTDC and Application of NTDC rate for Purchase
of Power by KESC. |
|
13-06-2008 - Tariff Petition - IESCO FY 2008-09 |
|
10-06-2008 - Tariff Petition - QESCO
FY 2008-09 |
|
10-06-2008 - Petition for Approval/
Determination of Tariff for Green Electric Phase I Combined Cycle
Power Plant at Dadu, Sindh |
|
31-05-2008 - Tariff Petition - HESCO FY 2008-09 |
|
31-05-2008 - Tariff Petition - MEPCO FY 2008-09 |
|
31-05-2008 - Tariff Petition - PESCO FY 2008-09 |
|
30-05-2008 - Tariff Petition - GEPCO FY 2008-09 |
|
26-05-2008 - Petition filed by Saif Power Limited |
|
16-05-2008 - Petition for Revision /
Modification of Earlier Tariff Ruling of Star Power Generation
Limited. |
|
08-04-2008 - Petition
filed by Zorlu Enerji Pakistan limited for revision / modification
of Generation Tariff |
|
12-03-2008 - Petition for Tariff
Modification on behalf of Gujranwala Electric Limited (GEL) |
|
23-01-2008 - Pakistan Sugar Mills
Association (PSMA) |
|
10-01-2008 - The Hub Power
Company Limited |
28-12-2007 CHASHMA Nuclear Power Plant Unit 1 | View |
18-12-2007 Foundation Power Company (Daharki) Limited | View |
01-11-2007 Liberty Power Tech Limited | View |
01-10-2007 Intergen (Private) Limited | View |
05-10-2007 Zorlu Enerji Pakisan Limited . TRF-88 | View |
25-09-2007 Blue Star Energy (Private) Limited TRF-86 | View |
14-09-2007 Halmore Power Generation Co (Pvt) Limited TRF-85 | View |
10-09-2007 Beastway Power Limited TRF-84 | View |
07-09-2007 Sapphire Electric Co Limited TRF-83 | View |
14-05-2007 Green Electric Limited TRF-77 | View |
09-02-2007 Engro Energy (Pvt) Limited | View |
16-02-2007 Win Power (Pvt) Limited | View |
16-01-2007 NIshat Mills Limited | View |
16-01-2007 Nishat (Chunian) Limited | View |
15-01-2007 Atlas Power Limited | View |
15-01-2007 Gujranwala Energy Limited | View |
10-01-2007 WARDA Power Generation (Pvt) Limited | View |
13-10-2006 Beacon Energy Limited 50 MW Power Project Wind Energyy | View |
29-05-2006 Green Power | View |
17-05-2007 Kohinoor Energy Limitedd | View |
31-05-2007 Tapal Energy Pvt. Ltdd | View |
27-09-2007 Japan Power Generation Limited | View |
06-07-2007 Saif Power Limited | View |